yes we have started moving cheers

we are still running the milling machines and doing manual work for another two weeks to get the next showmans/road loco kit done, but some of the stock items are starting to move over to the new place and preparations are underway to get the building ready for the machines etc.

first off is the office.

three desks for Isabel, Steve and dean. deans is the largest one at the back !!!



and looking back from deans desk... you can see a fourth desk in the corner for "extra" people



along from the office is the conference room...



and on the ground floor we have a store room and "show model" room...






craig@STW

Number of posts : 1194
Location : location Location
Registration date : 2010-05-06

View user profile

Back to top Go down

Re: new factory progress so far...

Post  craig@STW on Tue 12 Apr 2011, 1:08 am

and now onto the shop floor...

lets take you in the back way...



into the material and kit storage area...



this will be used for stock material, material handling and pre-packed kits.

looking to the left, you can see the storage racking going up...





and we will have these racks for storing 3meter bars...



through the large doors to the right and we enter the main shop floor...





so lets jump up onto the mezzanine you can see at the back and look back towards the way we came...

down this side will be the main machine shop...



and on the other side the welding bay and manual area, you can see the welding bay being built...





on top of the mezzanine we are standing on will be the part storage area...





and underneath will be the packing area and control models.

we need to get the main floor cleaned and painted and the electricians need to come in and fit the power points for the machines. also the compressed air system needs fitting. all this needs to be done by the 28th April as that's when we close down production and start moving machines !!!

craig@STW

Number of posts : 1194
Location : location Location
Registration date : 2010-05-06

View user profile

Back to top Go down

New factory

Post  Tony King on Tue 12 Apr 2011, 2:45 am

Thanks Craig for posting pictures of new factory premises, very interesting & impressive & gives us normal mortals a bit of an insight into the HUGE undertaking you all are faced with.
Can't wait to come down & see you all & go for a walk about.............. WELL DONE!!
Regards
Tony

Tony King

Number of posts : 856
Age : 61
Location : scotland
Registration date : 2008-10-31

View user profile

Back to top Go down

Re: new factory progress so far...

Post  sonick45 on Tue 12 Apr 2011, 9:36 am

Craig,
Can you find out when the plan to start painting the floor is.

I am more than happy to give up a day to help but need to know if the days you are painting are the days i'm off work.


Cheers
Nick


sonick45

Number of posts : 395
Location : Barton-Le-Clay (Beds)
Registration date : 2009-01-26

View user profile

Back to top Go down

Re: new factory progress so far...

Post  Steam Traction World on Tue 12 Apr 2011, 10:35 am

Hi Nick,

Thanks for the offer.

If everything stays to plan the floor is being cleaned Wednesday & Thursday and then being left to dry Friday. We then intend to put the initial sealing coat down on Saturday with the first coat of 2 pack down on Sunday.

Cheers

Dean

Steam Traction World

Number of posts : 886
Location : Daventry UK
Registration date : 2008-06-18

View user profile http://www.steamtractionworld.co.uk

Back to top Go down

Re: new factory progress so far...

Post  craig@STW on Sun 17 Apr 2011, 8:14 am

well we have all been slaving away painting the floor this weekend Neutral but on a plus side we are all now high as kites cheers cheers

the pink/brown areas are the undercoat that was done on Saturday and the grey is top coat number 1...





you can also see that the brickwork of the welding bay is done and the electrics have been started.

dont be fooled by this pic, dean is just using the roller to lean on as he talks on the phone Rolling Eyes Laughing Laughing



more good news is that the new sign is up. they are coming back to do some "tweaking" but i think you will agree it looks very impressive...




craig@STW

Number of posts : 1194
Location : location Location
Registration date : 2010-05-06

View user profile

Back to top Go down

Re: new factory progress so far...

Post  craig@STW on Thu 05 May 2011, 12:18 am

yes we have been moving this week cheers a lot of work has been going on over the last two weeks to get the new building ready. new electrics in, compressed air system in, extractor system in etc.

but this week it's time to move the big stuff...

looking at this photo, the cardboard marks the approximate position of the CNC machines...



and a few manual machines and the control models are in place to help gauge the amount of space they need...


craig@STW

Number of posts : 1194
Location : location Location
Registration date : 2010-05-06

View user profile

Back to top Go down

Re: new factory progress so far...

Post  craig@STW on Thu 05 May 2011, 12:22 am

and yesterday it was time to move this lot...





starting with the lathes...







and then the small mills...




craig@STW

Number of posts : 1194
Location : location Location
Registration date : 2010-05-06

View user profile

Back to top Go down

Re: new factory progress so far...

Post  craig@STW on Thu 05 May 2011, 12:27 am

the first machines in place in the new building...



followed by the mills...



so this is where we are first thing today, with just the large lathe and mill and steve's machines to move over. then we can start sorting out.









the old place is looking empty now, but still as filthy Rolling Eyes



Last edited by craig@STW on Thu 05 May 2011, 12:30 am; edited 1 time in total

craig@STW

Number of posts : 1194
Location : location Location
Registration date : 2010-05-06

View user profile

Back to top Go down

Re: new factory progress so far...

Post  craig@STW on Thu 05 May 2011, 12:28 am

more photos soon as the last machines go in place Cool

craig@STW

Number of posts : 1194
Location : location Location
Registration date : 2010-05-06

View user profile

Back to top Go down

New shop

Post  atomenter on Thu 05 May 2011, 12:55 am

Hi Craig
Looks good - how far is between the old and the new shops?
Regards

Tom A

atomenter

Number of posts : 163
Location : FIFE
Registration date : 2008-06-26

View user profile

Back to top Go down

Re: new factory progress so far...

Post  craig@STW on Thu 05 May 2011, 2:44 am

about 250 meters (metres) door to door Cool


Last edited by craig@STW on Sat 07 May 2011, 3:39 am; edited 1 time in total

craig@STW

Number of posts : 1194
Location : location Location
Registration date : 2010-05-06

View user profile

Back to top Go down

Re: new factory progress so far...

Post  chrisnchrisroberts on Thu 05 May 2011, 2:14 pm

don't you mean 250 metres? This is how the real world spells. Chris

chrisnchrisroberts

Number of posts : 115
Location : Blackbutt, Queensland, Australia
Registration date : 2008-10-31

View user profile

Back to top Go down

Re: new factory progress so far...

Post  craig@STW on Fri 06 May 2011, 12:12 am

too busy too spell Neutral



Laughing

craig@STW

Number of posts : 1194
Location : location Location
Registration date : 2010-05-06

View user profile

Back to top Go down

Re: new factory progress so far...

Post  craig@STW on Sat 07 May 2011, 3:48 am

all the machines are now in place and "usable".







the coolant tanks are missing in the photos, these have all been cleaned, leaks fixed and all pipes replaced.

some of us will be working over the weekend getting the DNC system in place (links the machines to the PCs), fitting coolant trays, filling with coolant, loading machines with tools and having another quick wipe over and clean up.

the packing area started going in late Friday.

the plan is to get all the systems in place and all the little fixes done before production starts up again otherwise things may never get done, however i would imagine the showman's/road loco cylinder blocks will be on the mill quite soon.

craig@STW

Number of posts : 1194
Location : location Location
Registration date : 2010-05-06

View user profile

Back to top Go down

What a difference!

Post  Steve Traill on Sat 07 May 2011, 7:31 am

Looking at the old factory and the new one you wouldn't think it's the same company! It looks stunning and is a credit to everyones hard work to make it look so good, really looking forward to the open day when it'll be all finished. cheers cheers cheers

Steve Traill

Number of posts : 605
Age : 60
Location : Illogan Redruth Cornwall
Registration date : 2008-06-29

View user profile

Back to top Go down

Re: new factory progress so far...

Post  craig@STW on Sat 07 May 2011, 8:12 am

I'd be the first to admit the old place is/was a mess, but then its hard to invest time in a place when you dont plan to stay there, and time is money as they say.

one of the machine engineers summed it up the other day when he said "you can't polish a turd" lol! lol!

craig@STW

Number of posts : 1194
Location : location Location
Registration date : 2010-05-06

View user profile

Back to top Go down

Re: new factory progress so far...

Post  Tim Watson on Sat 07 May 2011, 12:49 pm

Quote:
one of the machine engineers summed it up the other day when he said "you can't polish a turd"

Yes, you can if it's fossilised.

Tim

Tim Watson

Number of posts : 533
Location : Herts
Registration date : 2008-07-02

View user profile

Back to top Go down

Re: new factory progress so far...

Post  sonick45 on Sat 07 May 2011, 1:21 pm

Tim Watson wrote:Quote:
one of the machine engineers summed it up the other day when he said "you can't polish a turd"

Yes, you can if it's fossilised.

Tim


Very Happy That's Petrified Pooh Laughing

or is that

Scared Sh*tless !!

Wink

sonick45

Number of posts : 395
Location : Barton-Le-Clay (Beds)
Registration date : 2009-01-26

View user profile

Back to top Go down

Re: new factory progress so far...

Post  highpressure on Sat 07 May 2011, 4:27 pm

Mythbusters actually tried several different types of fresh pooh and discovered that with time and effort you can in fact polish various turds..... Very Happy Very Happy

Without sounding pushy will the new factory and layout help streamline production at all?? I assume it would help to make it easier to run stuff through

highpressure

Number of posts : 1096
Age : 49
Location : West Sussex, 4" DCC Road Loco
Registration date : 2008-06-18

View user profile http://www.simplydigitalaerials.com

Back to top Go down

Re: new factory progress so far...

Post  craig@STW on Sun 08 May 2011, 12:26 am

I'm not sure it would be quicker, but getting rid of all the clutter will certainly make it easier. most of the system will stay the same with the T-card board controlling what, where, when and by whom.

the thing you have to be careful of is making sure jobs don't go to packing before they are complete, and sometimes it not obvious as to whether they are or not. a job should not really be packed until its "signed off"

craig@STW

Number of posts : 1194
Location : location Location
Registration date : 2010-05-06

View user profile

Back to top Go down

Re: new factory progress so far...

Post  craig@STW on Sun 08 May 2011, 9:24 am

more progress on the CNC machines over the weekend. the DNC system is nearly in, all dodgy electrical connections repaired, more in-depth cleaning done under the slide way covers, fresh coolant in half the machines and tooling should start going in tomorrow.

been warming them up today with a little program that gets all the tables moving around and the spindles running. just helps to get the slides oiled up after the jet washing Shocked

craig@STW

Number of posts : 1194
Location : location Location
Registration date : 2010-05-06

View user profile

Back to top Go down

Re: new factory progress so far...

Post  craig@STW on Mon 16 May 2011, 1:20 pm

well we are finally getting sorted, with the office being moved in today.

things are slowly finding there place and production has started again with the showmans/road loco cylinder blocks (for next month), showmans/road loco kit 18 (Steering)and completion of the current foden and lyka kits.

machine shop...





tool stores...



packing area...



manual area...



material stores...



kit stores...


craig@STW

Number of posts : 1194
Location : location Location
Registration date : 2010-05-06

View user profile

Back to top Go down

Re: new factory progress so far...

Post  bjwlancashire on Tue 17 May 2011, 6:30 am

Wow, looks like a proper engineering shop now, you will be able to branch out soon. I bet all your stafff find it a lot nicer working in this environment too, productivity should go up now. Laughing

Brian

bjwlancashire

Number of posts : 934
Location : Mellor, Lancashire
Registration date : 2010-09-07

View user profile

Back to top Go down

Re: new factory progress so far...

Post  craig@STW on Tue 17 May 2011, 9:48 am

one thing we have noticed is how much more the sound travels around. you can hear the radio in the front office !!! Laughing

craig@STW

Number of posts : 1194
Location : location Location
Registration date : 2010-05-06

View user profile

Back to top Go down

Re: new factory progress so far...

Post  Sponsored content Today at 3:49 pm


Sponsored content


Back to top Go down

Page 1 of 2 1, 2  Next

View previous topic View next topic Back to top

- Similar topics

 
Permissions in this forum:
You cannot reply to topics in this forum