well its a new quarter and a new topic... yes it will soon be Christmas affraid affraid affraid affraid

first up this week are the BU4 weigh-shaft brackets. turn around on these is quite quick and they are all finished...





BU4 reach rods...



and the reach rod ends...



the pile of drilled lyka boiler plates is slowly growing...



and the prototype boiler is nearly ready...



another job i have to get done are these foden 6inch front stub axles, needed for stock...



brass elbows for the next roller kit...



and the cladding is all done...



the manual section is now working on the pipes for the roller...







and the standard BU4 ash pan is ready to fit...

avatar
craig@STW

Number of posts : 1310
Location : location Location
Registration date : 2010-05-06

View user profile

Back to top Go down

Re: October/November/December 2018 production photos.

Post  Mark the spark on Fri 05 Oct 2018, 4:37 pm

Hi Craig
What do you think the chances are of seeing the last two showmans kits before Christmas

Mark the spark

Number of posts : 238
Location : Edinburgh
Registration date : 2015-04-26

View user profile

Back to top Go down

Re: October/November/December 2018 production photos.

Post  craig@STW on Fri 12 Oct 2018, 3:21 pm

we have sent one of the new dynamos out to a customer for testing and feedback suggests that more development is needed. Ian has been tasked with getting this sorted next week. Dean is very aware and genuinely concerned about the situation. we will have more news some time next week.
avatar
craig@STW

Number of posts : 1310
Location : location Location
Registration date : 2010-05-06

View user profile

Back to top Go down

Re: October/November/December 2018 production photos.

Post  craig@STW on Fri 12 Oct 2018, 4:07 pm

a few photos from this week...

6inch foden front stub axles. the king pin hole has now been bored, not as simple as it looks as it runs at 91 degrees to the turned shaft !!!
just waiting for the 4th axis machine to be free so i can finish these...



and some 6inch front springs are formed, ready for heat treating...



for those people wondering about the new Lyka boilers. work is getting done on these. all the barrels are weld prepped...



and the drilled plates are having bushes welded in...



the laser cut parts for the showmans/road loco belly tank are in...



and im machining the fillets for these...



im also working on lubricator brackets...



and BU4 slide bars...



on the lathes, mark has moved on to the 6inch foden cylinder accessory kit. unfortunately there has been a delay with the cylinder block castings
due to a problem at the foundry, but at least the next kit will be ready when they finally arrive.

HP trunk guide glands are turned...



and HP covers are on now...




avatar
craig@STW

Number of posts : 1310
Location : location Location
Registration date : 2010-05-06

View user profile

Back to top Go down

Re: October/November/December 2018 production photos.

Post  Sponsored content


Sponsored content


Back to top Go down

Back to top

- Similar topics

 
Permissions in this forum:
You cannot reply to topics in this forum