im not sure how anyone with a user name like Goliewogs feels he can lecture anyone on being ignorant and uninformed ??? but hay ho, on to this weeks photos...

the machined lyka upper chassis parts have moved over into final fabrication with multiple brackets and fittings being welded into place...





and the upper sections are bolted together...



battery boxes are formed and welded...



and the main wood side panels have arrived...



lots of small parts in the machine shop this week, including whistle bodies...



water lifter bodies...



water lifter steam cones...



water lifter pipe bracket...



and brake wheels...



and we have moved on to the 6inch foden smokebox kit...



door rings...



 chimney bases...



and smoke box door handles...

avatar
craig@STW

Number of posts : 1249
Location : location Location
Registration date : 2010-05-06

View user profile

Back to top Go down

Re: October/November/December production photos.

Post  craig@STW on Fri 08 Dec 2017, 3:54 pm

this weeks photos. it may seem like a lot of Lyka upper chassis stuff again but it does show how long it can take to get these large kits done.

the main chassis rails are very complicated, and feature most of the small brackets and fittings we have made over the last few weeks.



the cross members have their fair share of brackets...



the upper frame is much more simple...





but it has all come together correctly... 



and Ian is fitting the wooden side panels as i type...



one last part that we had to make this week and a new feature on the Lyka is a wooden mount for the front spring...



yes, we can machine wood as well. actually its cuts very well...



on the machines this week its mostly been the 6inch foden smoke-box kit again. the door rings are finished on the turning...



and the chimey bases just need a side hole drilling...



this is them on the angle plate having the mounting holes drilled



other work includes loads of beading and the tow brackets for the showmans kit 7...

avatar
craig@STW

Number of posts : 1249
Location : location Location
Registration date : 2010-05-06

View user profile

Back to top Go down

Re: October/November/December production photos.

Post  Grier on Sun 10 Dec 2017, 8:24 pm

Lyka parts look great! Really shaping up now. I can see what you were referring to with all the small brackets and parts. I’m sure it is like the old saying “measure twice ....”
Thank You Craig and crew for your hard work.

Grier

Number of posts : 19
Location : Topsail Beach, NC
Registration date : 2015-05-15

View user profile

Back to top Go down

Re: October/November/December production photos.

Post  craig@STW Yesterday at 3:50 pm

this weeks photos...

some may be glad to know that these should be the last lyka photos for the moment, but i just wanted to share these last two as its quite a significant change to the design and the reason for any delays. 

the new boiler mount is now in place on the control model and this kit is being packed as i type...





still working on the 6inch foden smoke-box kit. this is the tow bracket casting...





and the massive boiler cradle casting. just the 1st opp on these is 41 minutes long !!!





more tender side fillet sections need making...



and these were a late arrival for the burrell cylinder accessory kit, the name badges...



and we are also working on the roller rear axle and 2nd shafts...

avatar
craig@STW

Number of posts : 1249
Location : location Location
Registration date : 2010-05-06

View user profile

Back to top Go down

Re: October/November/December production photos.

Post  Sponsored content


Sponsored content


Back to top Go down

Page 2 of 2 Previous  1, 2

View previous topic View next topic Back to top

- Similar topics

 
Permissions in this forum:
You cannot reply to topics in this forum