general production update: november 2013

Post  craig@STW on Mon 18 Nov 2013, 1:19 pm

another long awaited update (sorry about that peeps, can't believe its been this long Embarassed )

first thing to show is another batch of completed boilers. the second lot done by our new welder...



and as soon as the 6inch foden cylinders were done it was time to get on with the four inch ones.
after the front and rear faces are done everything else is done in one op on the 4th axis machine that lasts 1hour 20mins !!!





and then the liners are shrunk in...



this month we have also completed another full batch of water cart/bowsers. this goes out as one large complete kit...


















craig@STW

Number of posts : 1194
Location : location Location
Registration date : 2010-05-06

View user profile

Back to top Go down

Re: general production update: november 2013

Post  craig@STW on Mon 18 Nov 2013, 1:29 pm

we are also working on Kit2 of the new batch of showmans and kit one of the new single crank compound model.

hubs, covers rivets etc are all done...



wheels rims are rolled...



and are now being welded up...



and we just have the spokes to do on this and then its ready.

also been working on the showmans flywheels...



also probably worth a mention is the small change to the way production is manged. general organization, material ordering and preparation used to be shared by about four different people. all this will now be done by Ian, through direct contact with Dean and Steve, allowing the rest of us to get on getting the bits made Cool 

more updates soon, but if i do forget. just shout Wink 

craig@STW

Number of posts : 1194
Location : location Location
Registration date : 2010-05-06

View user profile

Back to top Go down

Re: general production update: november 2013

Post  HStannard on Mon 18 Nov 2013, 1:31 pm

Anything for the 6" Fodens?? Question  Crying or Very sad 

HStannard

Number of posts : 52
Location : Rushden, Northants
Registration date : 2011-11-09

View user profile

Back to top Go down

Re: general production update: november 2013

Post  craig@STW on Mon 18 Nov 2013, 1:33 pm

next kit for the 6inch fodens will be the horn-plates. just waiting on the laser cuts to arrive. most of the other material is already hear.

craig@STW

Number of posts : 1194
Location : location Location
Registration date : 2010-05-06

View user profile

Back to top Go down

Re-general-production-update-november-2013

Post  sherwood-ranger on Mon 18 Nov 2013, 2:04 pm

Hi Craig, what's the latest on the 2" boilers?
Thanks in advance.

sherwood-ranger

Number of posts : 19
Age : 52
Location : witney
Registration date : 2012-03-13

View user profile

Back to top Go down

Re: general production update: november 2013

Post  tractor mike on Mon 18 Nov 2013, 2:32 pm

Hi Craig thanx for the update. All looking really good Very Happy 

tractor mike

Number of posts : 74
Age : 32
Location : taunton somerset
Registration date : 2012-01-29

View user profile

Back to top Go down

Re: general production update: november 2013

Post  craig@STW on Tue 19 Nov 2013, 9:32 am

sherwood-ranger wrote:Hi Craig, what's the latest on the 2" boilers?
Thanks in advance.
apparently the 2inch boilers are nearly ready. just the final "tidying" to do Cool 

craig@STW

Number of posts : 1194
Location : location Location
Registration date : 2010-05-06

View user profile

Back to top Go down

Re: general production update: november 2013

Post  augustrock on Wed 20 Nov 2013, 3:09 am

Burrell 4" Agric.

It is a long time since we had Kit 19. When is Kit 20 due. I see no mention of it in your forecast of production.

It is very cold in the workshop with nothing to do!

Peter.

augustrock

Number of posts : 29
Location : Andover Hampshire
Registration date : 2008-06-19

View user profile

Back to top Go down

Re: general production update: november 2013

Post  busman on Wed 20 Nov 2013, 12:35 pm

Kit 20 plus the elusive flywheel!!:

busman

Number of posts : 25
Location : Herne Bay Kent
Registration date : 2011-08-02

View user profile

Back to top Go down

Re: general production update: november 2013

Post  craig@STW on Thu 21 Nov 2013, 2:41 am

the next 4inch agric kit will be kit 22. not kit 20. kit 22 is gear change, water gauge and whistle parts and should go out by the end of the month.

craig@STW

Number of posts : 1194
Location : location Location
Registration date : 2010-05-06

View user profile

Back to top Go down

Re: general production update: november 2013

Post  craig@STW on Sun 24 Nov 2013, 8:48 am

a few more pics of this weeks work...

the water cart is just waiting for the seat pads to arrive...



the SCC wheels being welded and drilled...







and the spokes are here...





and the completed wheel...



loads of laser cuts arrived this week. apart from the SCC spokes, most of them are for the next 6inch foden kit.



the horn plates are ready to go onto the CNC for drilling...



and I've stared work on the support brackets...




not sure if i'll get an update done next weekend cos im moving house. but if there's anything extra special to see i'll get a photo Cool 


craig@STW

Number of posts : 1194
Location : location Location
Registration date : 2010-05-06

View user profile

Back to top Go down

Re: general production update: november 2013

Post  Sponsored content Today at 1:53 pm


Sponsored content


Back to top Go down

View previous topic View next topic Back to top

- Similar topics

 
Permissions in this forum:
You cannot reply to topics in this forum